Open Menu
Proven Execution

26 Keys Productions

Management

Overview

As a construction manager, I had the privilege of overseeing the development of a one-of-a-kind office space for my client. The goal was to design a functional, creative workspace that honored their Texas roots while meeting the unique requirements of their television and movie editing business. This included creating editing suites, a soundproofed theater, and collaborative spaces – all within the confines of a tight schedule, budget, and external limitations.

 

Project Background

The journey began six months before construction. I worked with the client to identify potential office spaces by walking through several properties and conducting pricing exercises. These early steps provided insight into the feasibility of the project and built a strong working relationship with the client. Together, we clarified their vision: a Texas-inspired office with creative flair, technical precision, and functionality tailored to their industry.

 

Challenges

The project presented several challenges that required innovative problem-solving:

 

Solutions and Exectutions

Working with Jonathan Miller, our ECR Construction Project Manager, on the 26 Keys Austin Office Build-out was an exceptional experience. Jonathan’s professionalism, attention to detail, and clear communication made the entire process seamless. He consistently kept the project on track, addressed any challenges with creative solutions, was quick to answer our questions, and ensured that every aspect of the build-out met our expectations. We gave him what many would consider an impossible timeline to execute the project and he managed to make the impossible possible. His proactive approach and collaborative attitude made working together smooth and enjoyable, and we truly appreciated his commitment to delivering a high-quality result on a short timeline. I left the project with the utmost gratitude and appreciation for his contribution and made a wonderful friend in the process. I’m thrilled to refer and recommend for anyone’s future construction build out

Maddy Bilder
Project Director
Key Features of the Completed Space

 

Outcome

Despite the challenges, the project was completed on time and within budget. The client was thrilled with the result, which met their functional needs and embodied their vision and company culture. The strong relationship built during the initial phases proved invaluable, fostering trust and collaboration throughout the project.

 

Lessons Learned

This project underscored the importance of adaptability, clear communication, and collaboration in overcoming complex challenges. We delivered a space that exceeded expectations by staying focused on the client’s goals and maintaining a solutions-oriented approach.

Back to Top